Outrigger installation, Operation – Snorkel ULII40-sn15001-21372 User Manual
Page 14
3
Outrigger Installation
1.
Remove
the
outriggers
from
storage
locations
on
sides
of
mast.
2.
Insert
into
outrigger
socket
in
base
(Figure
1).
3.
Push
in
until
locking
pin
engages
hole
in
end
of
outrigger.
Pull
outward
on
outrigger
to
ensure
engagement.
4.
Repeat
the
above
steps
for
all
other
outriggers.
Make
sure
all
four
(4)
locking
pins
are
engaged.
5.
Level
the
base,
centering
the
bubble
in
the
orbit
level
on
the
base
by
adjusting
the
screwjacks
at
the
end
of
each
outrigger
(Figure
1).
DO
NOT
release
the
tension
on
an
outrigger,
by
turning
counterclockwise,
to
level
base.
6.
All
four
(4)
screwjack
pads
must
be
in
solid
contact
with
a
firm
surface
and
each
outrigger
indicator
light
must
be
lit
before
the
platform
is
elevated.
Figure
1:
Installing
outriggers
Figure
2:
C
ontrols
Platform
Controls
Base
Controls
Bubble
Level
Indicator
Light
Locking
Pin
Screwjack
Emergency
Stop
Button
Key
Switch
Emergency
Stop
Button
Up
Power
Down
Emergency
Lowering
Valve
Operation
Before
operating
UL
Lift
insure
that:
the
operator
has
been
thoroughly
trained
on
this
machine,
the
opera-
tor
has
read,
fully
understands
and
follows
this
Operator
M
anual,
and
th
e u
nit
h
as
been
properly
set
up
with
all
four
(4)
outriggers
properly
installed
and
the
base
leveled,
and
the
machine
has
passed
the
Safety
Interlock
Test.
Note:
Platform
w
ill
not
elevate
unless
all
four
outriggers
are
properly
installed
with
screwjack
pads
firmly
in
contact
with
floor
and
each
outrig-
ger
indicator
lamp
lit.
1.
Check
for
external
damage
to
the
mast.
2.
For
AC
units
connect
power
unit
plug
to
exten-
sion
cord
(12
ga.
(1.5
mm²)
conductor
minimum
and
50
ft.
(15
m)
in
length
m
aximum).
Connect
extension
cord
to
properly
grounded
outlet
of
proper
voltage
and
frequency.
3.
Turn
Key
to
ON
, Key
Switch
is
located
on
the
left
side
of
the
mast
(Figure
2).
4.
Pull
out
on
Lower
Emergency
Stop
Button,
located
on
the
left
side
of
the
m
ast
(Figure
2),
to
turn
switch
ON.
In
the
event
of
an
emergency
push
the
button
in
to
cut
power
to
all
controls.
5.
Enter
the
platform
by
pulling
out
on
the
locking
pin
and
lifting
up
on
the
upper
half
of
the
cage.
6.
Lower
upper
half
of
the
cage
after
en
ter
in
g
platform
m
aking
sure
locking
pin
is
engaged.
7.
Check
that
the
area
above
th
e p
lat
fo
rm
is
cle
ar
before
ele
va
tin
g the
platform.
8.
Pull
out
on
Emergency
Stop
Button,
located
on
platform
control
panel
(Figure
2).
In
the
event
of
an
emergency
push
the
button
in
to
cut
power
to
all
controls.
9.
Push
both
the
middle
and
top
buttons
(POWER
and
UP),
on
the
Control
Box
(Figure
2),
at
the
same
time
to
elevate
the
platform.
Release
the
buttons
to
stop.
10
.Check
that
the
area
below
the
platform
is
clear
before
lowering
the
platform.
11
.Push
both
the
middle
and
bottom
buttons
(POWER
and
DOWN)
at
the
same
time
to
lower
the
platform.
Release
the
buttons
to
stop.
12
.After
use,
secure
unit
from
unauthorized
use
by
turning
Key
Switch
to
OFF
and
remove
key.
30
ULII
Electric
Schematic
- 068010-000
ENGLISH
FRANCAIS
GERMAN
SPANISH
1
Switch
Commutateur
Schalter
Interruptor
2
Bridge Rectifier
3
R
elay
Relais
Relais
Relé
4
Solenoid
Solénoïde
Magnetventil
Solenoide
5
Motor
Moteur
Motor
Motor
6
Relay
contacts
Contacts de relais
Relaiskontakte
Contactos del relé
7
Transformer
Transformateur
Transformator
Transformador
8
ndicator lights
Témoins
Anzeigeleuchten
Luces
indicadoras