General maintenance, Gauge label replacement - model 53 pd (continued) – Fluid Management 53PD Blendorama User Manual User Manual
Page 32
![background image](/manuals/545195/32/background.png)
30 | Blendorama Dispenser
Fluid Management Customer Service 1 . 800 . 462 . 2466
e. Peel the adhesive backing off the black label.
f. Carefully place the first line of the label (the line
below the first numeral) on the marked line of
the gauge.
g. Once in position, press the label firmly onto the
gauge, ensuring it adheres to the gauge along
its full length with no creases or bubbles (use a
clean cloth to apply if necessary).
h. Refit the black (outer) gauge to the plunger and
remove the red (inner) gauge from the pump.
i. Peel the adhesive backing off the remaining red
label.
General Maintenance
Gauge label replacement - Model 53 PD (continued)
This manual is related to the following products: