General maintenance, Gauge label replacement - model 25 pd (continued) – Fluid Management 53PD Blendorama User Manual User Manual
Page 30
![background image](/manuals/545195/30/background.png)
28 | Blendorama Dispenser
Fluid Management Customer Service 1 . 800 . 462 . 2466
f. Carefully place the “0” line (the line below the
numeral) of the label on the marked line of the
gauge.
g. Once in position, press the label firmly onto the
gauge, ensuring it adheres to the gauge along
its full length with no creases or bubbles (use a
clean cloth to apply if necessary).
h. Using a sharp knife or blade cut any excess
label off the end of the gauge that may overlap
the black plastic handle.
i. Refit the gauge to the plunger. Repeat steps (d)
through (h) for the inner (red) gauge label.
General Maintenance
Gauge label replacement - Model 25 PD (continued)
This manual is related to the following products: