Getting started, Installation (continued) – Fluid Management 53PD Blendorama User Manual User Manual
Page 14
![background image](/manuals/545195/14/background.png)
12 | Blendorama Dispenser
Fluid Management Customer Service 1 . 800 . 462 . 2466
Getting Started
Installation (continued)
It is important that the canisters are assembled and installed
correctly to ensure stability of the canisters on the turntable
and correct functioning of the stirring mechanism.
8
Lock the turntable in place
a. Rotate the turntable until it engages into a locked position.
b. Use the detent (or knob) lever to disengage and rotate the turntable.
c. Leave the turntable in locked position.
Note: It is important that the colorant is stirred to ensure continuous smooth operation of the machine.
If left unstirred for extended periods, colorant can become thick and difficult to stir which can
utimately damage the machine.
9
Power up
a. Plug the power cord into the proper electrical circuit (see Technical Specifications and Warnings for
details).
b. Turn power switch (located at the back of the machine) to the ON position. The stirring process will
begin.
•