General maintenance, Gauge label replacement - model 25 pd – Fluid Management 53PD Blendorama User Manual User Manual
Page 29
![background image](/manuals/545195/29/background.png)
Fluid Management Customer Service 1 . 800 . 462 . 2466
Blendorama Dispenser | 27
Before replacing the labels, calibrate the plungers as per the calibration instructions. Also make sure that the
replacement label is the correct one - check the part numbers.
a. Remove both black and red gauges.
b. Peel the labels off both the red and black
gauges. Remove all traces of adhesive (use a
solvent if necessary). Wipe dry.
c. Replace both gauges and set to the zero (fully
down) position. The locking pin at the rear of the
pump should be engaged in the first of the small
holes.
d. Mark a line on the black gauge, level with the top
of the red handle. Use a fine felt tip pen or pencil
(or scratch with a sharp object).
e. Remove the gauge from the pump and peel off
the adhesive backing.
General Maintenance
Gauge label replacement - Model 25 PD