Installation requirements – Pulsafeeder Isochem RGT IOM User Manual

Page 9

background image

4

4. Installation Requirements

The pump installation site should provide easy access for routine maintenance and when possible
to protect the pump from the elements and from leaks or drips from nearby process equipment.

Figure 2




I

N A POWER FRAME

(

THAT IS

,

NOT CLOSE

-

COUPLED

)

INSTALLATION

,

THE USE OF A LOW

-

BACKLASH OR RELATIVELY RIGID MOTOR COUPLING IS RECOMMENDED TO PREVENT MAGNETIC

DE

-

COUPLING AT STARTUP OR UNDER WIDELY VARYING PROCESS CONDITIONS

.


T

HE PROVISION OF A

SOFT

-

START

MOTOR STARTER WILL REDUCE THE POSSIBILITY OF

MAGNETIC DE

-

COUPLING AT STARTUP WITH A FAST

-

STARTING OR OVERSIZED MOTOR

.


A

S THE PUMP IS SUPPORTED BY THE MOTOR MOUNT

,

TAKE CARE THAT THE SUCTION AND

DISCHARGE PIPING DOES NOT APPLY FORCES OR MOMENTS

(

TWISTING

)

TO THE PUMP

.

F

OR OPTIMUM PERFORMANCE

,

A MINIMUM

1-1/2

INCH SUCTION LINE SIZE IS RECOMMENDED