Pulsafeeder Isochem RGT IOM User Manual

Page 10

background image

5

1. Bolt the pump down firmly to the mounting surface. Provide for air movement over the electric

motor as required.

The pump is functionally symmetrical so that the suction and discharge ports can be reversed
(with direction of rotation) and the housing (with cover) can be rotated to suit the installation if
required. Refer to Figure 3, for typical installation and the required relation between rotation and
direction of flow.

Figure 3

2. It is recommended to install vacuum/pressure gauges in the suction and discharge lines to monitor

system operation.

3. Keep suction lines short and straight to minimize friction loss to the pump. Make sure that the

pump will not starve or run dry. Flooded suction or gravity feed of fluid to the pump inlet is
preferred and eliminates manual priming.

4. Use only full-bore ball valves or gate valves in the suction piping. If suction strainers are used,

size them to minimize pressure drop and select a type that is easily cleaned. Strainers should be
regularly inspected and cleared of debris as required during operation.

T

HE

I

SOCHEM

RGT

PUMP SHOULD BE USED TO PUMP CLEAN

,

CLEAR LIQUIDS ONLY

. T

HIS PUMP

CANNOT HANDLE SOLIDS OR PARTICULATES IN THE PROCESS STREAM

.

5. Arrange all suction piping and fittings to prevent formation of air pockets. Make sure all joints

are air tight.

6. Flush all suction lines prior to mating up to the pump. Use unions or other appropriate fittings for

ease of maintenance.

DISCHARGE PORT

DISCHARGE PORT

SUCTION PORT

SUCTION PORT