beautypg.com

Power frame maintenance – Pulsafeeder Isochem RGT IOM User Manual

Page 40

background image

35

Power Frame Maintenance

General Maintenance:


Fill power frame oil cup (item 9) to the “oil level” line, about ½” from the top edge of the cup. Use
standard motor oil, SAE-10W-40, 10W-30, SW-30, or equivalent.

Drain and change oil after every 2,000 hours of operation. Increase frequency of oil changes if operating
in an adverse environment, for example high moisture, very high or low temperatures, etc.

Disassembly:

1. Remove bearing cap bolts (item 6)

2. Slide bearing cap (item 5) out of housing and over the end of the shaft (item 2)

3. Remove shaft/bearing assembly by sliding out of housing

Reassembly:


1. Press new bearings (item 3 both ends) onto shaft if replacement is required

2. Inspect the surface of the shaft (item 2) for burrs and scratches, clean and smooth as required.

3. Press new lip seals (item 7) into housing and bearing cap. Apply grease to the inside diameter of

the lip seals.

4. Install a new gasket (item 4) on the bearing cap.

5. Slide the shaft/bearing assembly into the power frame housing. The end stamped “F” must be

towards the bearing cap.

6. Shim if required to obtain shaft end-play of 0.000 – 0.004 inches.

7. Replace the bearing cap bolts (item 6) and tighten.

8. Refill with oil as per instructions above.