Euro jet application recommendations, Save these instructions – Balboa Water Group Euro Jet User Manual
Page 2

Euro Jet Application Recommendations
Thoroughly read and understand these application recommendations and installation instructions before
installing the Euro Jet.
While installation is simple, there are many variables with each spa manufacturer’s process that are beyond
Balboa Water Group’s control. Therefore we STRONGLY RECOMMEND that every OEM thoroughly test
the application of this jet before using it on their production line.
The design of the Euro Jet creates a seal at the front (acrylic side) of the spa. There are advantages to
sealing at the front of the spa.
Acrylic is an optimal smooth sealing surface, much better than sealing from the back of the jet.
UÊ
Sealing at the inside of the spa wall can prevent potential leaks or fiberglass delamination.
UÊ
To fully gain these advantages, the mounting surface must be flat and clean.
UÊ
Examine the drilling process. The hole must not be drilled larger than 1-1/8 inch in diameter.
Do not allow the hole saw to “work or walk” during drilling! This could produce a hole that is off center
or not round. Ensure that your hole saw is sharp. A dull hole saw will create excessive heat. The excessive
heat will cause the acrylic to curl up at the edge of the hole, leaving a burr. These conditions will impede
the sealing process.
Following these recommendations will provide trouble free installation and operation of the Euro Jet. If
you have application questions, please call (714) 384-0384.
SAVE THESE INSTRUCTIONS