beautypg.com

Allied Telesis AT-PBC18 User Manual

Page 39

background image

PowerBlade PBC18 Quick Install Guide

29

3.

Remove the management module from the shipping package and store the
packaging material in a safe location.

Caution
Wear a grounding device and observe electrostatic discharge precautions
when installing the PowerBlade module in the chassis. Failure to
observe this caution could result in damage to the PowerBlade module.

4.

Slide the management module gently into place, seating the module’s
connectors into the chassis’ backplane. See Figure 23.

Figure 23 Installing a Management Module

5.

Secure the management module to the chassis by tightening the two
thumbscrews.

6.

Apply power to the chassis by connecting the AC power cord or DC wires.
Refer to page 11, Step 4 for an AC unit or Step 5 for a DC unit.

7.

Check to be sure that the Status and PWR LED on the front of the
management module are green. If one or both of the LEDs are OFF, refer
to “Troubleshooting” on page 31 for instructions.

8.

For local management, attach one end of the RS-232 cable with the DB-9
connector to the RS-232 port on the management module and the other
end of the cable to a terminal or PC with a terminal emulator program.

9.

For remote management, connect a Category 3 or better twisted pair
cable with an RJ-45 connector to the 10Base-T port on the management
module and the other end of the cable to 10 Mbps or 10/100 Mbps port on
an Ethernet hub or switch.

PWR 2

PWR 1

PBPWRA

C

AC INPU

T

100-2

40AC

50-60

Hz

3A MA

X.

150W

PBM0

2

Manag

ement

MDI-X

MDI

LNK

STATU

S

PWR

RESE

T

RS-232 T

erminal

10Base-T

PBPWRA

C

AC IN

PUT

100-2

40AC

50-60

Hz

3A MA

X.

150W