Guiderail thumbscrew – Allied Telesis AT-PBC18 User Manual
Page 28

18
2.
Remove the PowerBlade Switch or Media Converter module from the
shipping package and store the packaging material in a safe location.
Caution
Wear a grounding device and observe electrostatic discharge precautions
when installing the PowerBlade module in the chassis. Failure to
observe this caution could result in damage to the PowerBlade module.
3.
Slide the module gently into place, aligning it with the guiderail, until it
firmly connects to the chassis’ backplane. See Figure 14.
Figure 14 Installing a PowerBlade Module
4.
Secure the module to the chassis by tightening the thumbscrew.
5.
Verify that the PR LED on the module is green. If the LED is OFF, refer
to “Troubleshooting” on page 31 for instructions.
6.
Verify the MissingLink/Link Test (ML/LT) button is set correctly. Refer to
the PowerBlade PBC18 Installation Guide for instructions.
7.
Connect the appropriate data cables.
The PowerBlade module is now ready for use. Repeat this procedure to install
additional PowerBlade Switch or Media Converter modules.
PB14
10M
bps
ML
F
L
T
T
X
R
X
M
M
LK
RX
LT
MDI
MDI-X
LK
RX
ML PR
Guiderail
Thumbscrew