Allied Telesis AT-iMG646PX-ON User Manual
Installation guide, Enclosure and intelligent multiservice gateways
This manual is related to the following products:
Table of contents
Document Outline
- Electrical Safety and Emissions Standards
- Translated Safety Statements
- Chapter 1
- Chapter 2
- Chapter 3
- Chapter 4
- Chapter 5
- Chapter 7
- Appendix A
- Appendix B
- Appendix C
- Contents
- Figure 1. AT-iMG646xx Series Intelligent Multiservice Gateway 20
- Figure 2. Gateway LEDs 21
- Figure 3. AT-EN646 Enclosure 26
- Figure 4. Mounting Hole Locations 33
- Figure 5. Grounding Plate 35
- Figure 6. Aligning the Grounding Plate 35
- Figure 7. Location of Fiber Optic Drop Cable and Ground Wire Entrance 36
- Figure 8. Inserting the Wire Tie 37
- Figure 9. Positioning the Cable 37
- Figure 10. Drop Cable Secured to the Grounding Plate 38
- Figure 11. Lining Up the Ground Wire 39
- Figure 12. Securing the Tracer Wire and Aramid Yarn 40
- Figure 13. Location of Fiber Optic Drop Cable and Ground Wire Entrance 40
- Figure 14. Inserting the Wire Tie 41
- Figure 15. Opening Out the Shielding 41
- Figure 16. Positioning the Cable 42
- Figure 17. Armored Drop Cable Secured to the Grounding Plate 42
- Figure 18. Lining Up the Ground Wire 43
- Figure 19. Two-Part Metal Splice Tray 44
- Figure 20. Inserting the Wire Ties 45
- Figure 21. Securing the Buffer Tube 45
- Figure 22. Setting the Fiber Cable in the Splice Tray 46
- Figure 23. Securing the Pigtail 46
- Figure 24. Securing the Metal Splice Tray 47
- Figure 25. Inserting the Wire Ties 48
- Figure 26. Securing the Buffer Tube 48
- Figure 27. Setting the Fiber Cable in the Splice Tray 49
- Figure 28. Securing the Pigtail 49
- Figure 29. Securing the Plastic Splice Tray 50
- Figure 30. Location of the Mounting Post 56
- Figure 31. Positioning the Gateway on the Mounting Post 56
- Figure 32. Securing the Gateway to the Mounting Post 57
- Figure 33. Mounting the Gateway 57
- Figure 34. Power Cord Entrance 58
- Figure 35. Proper Installation of the Terminal Block Ground Wire 59
- Figure 36. Plugging in the DC Terminal Block 60
- Figure 37. Mounting the Metal Splice Tray on the Gateway 61
- Figure 38. Mounting the Plastic Splice Tray on the Gateway 61
- Figure 39. Securing the Fiber Cable 62
- Figure 40. Telephone Wire Entrance 63
- Figure 41. Connecting the Telephone Wires 63
- Figure 42. LAN Cable Entrance 64
- Figure 43. Inserting the Wire Tie 64
- Figure 44. Connecting the LAN Cables 65
- Figure 45. Connecting the Management Cable 65
- Figure 46. Securing the Plywood to the Wall 74
- Figure 47. Putting the Washer on the Stud 75
- Figure 48. Securing the Grounding Stud 75
- Figure 49. Securing the Gateway to the Mounting Surface 76
- Figure 50. Securing the Ground Wire Lug 77
- Figure 51. Proper Installation of the Terminal Block Ground Wire 79
- Figure 52. Plugging in the DC Terminal Block 80
- Figure 53. Connecting the Fiber Optic Cable 81
- Figure 54. Connecting the Telephone Wires 82
- Figure 55. Connecting the LAN Cables 83
- Figure 56. Connecting the Management Cable 84
- Figure 57. Gateway Terminal Block to Power Cord Terminal Block Wiring Diagram 90
- Figure 58. Ferrule in an SC Connector Plug 91
- Figure 59. Unclean and Clean Ferrule 91
- Figure 60. Cartridge Cleaner 92
- Figure 61. Rubbing the Ferrule Tip on the Cleaning Surface 92
- Figure 62. Lint-Free and Alcohol-Free Swabs 94
- Figure 63. Cleaning a Recessed Ferrule 94
- Figures
- Tables
- Preface
- Chapter 1
- Overview
- Section I
- Chapter 2
- Outdoor Installation Overview
- Chapter 3
- Installing the Enclosure
- Reviewing Safety Precautions
- Required Tools and Supplies
- Mounting the Enclosure
- Installing the Grounding Plate
- Installing the Fiber Optic Drop Cable
- Splicing the Drop Cable and Securing the Fusion Splice Tray
- Chapter 4
- Installing the Gateway Outdoors
- Reviewing Safety Precautions
- Required Tools and Supplies
- Installing the Gateway
- Section II
- Chapter 5
- Installing the Gateway Indoors
- Reviewing Safety Precautions
- Required Tools and Supplies
- Preparing for the Installation
- Fastening the Plywood Mounting Surface to a Wall and Preparing the Gateway
- Connecting the Ground Wire
- Preparing and Connecting the Power Cord
- Connecting the Fiber Optic Cable
- Connecting the Telephone Wires
- Connecting the LAN Cables
- Completing the Installation
- Section III
- Chapter 7
- Troubleshooting
- Appendix A
- Technical Specifications
- Appendix B
- Cleaning Fiber Optic Connectors
- Appendix C
- Turnup Process