beautypg.com

Allied Telesis AT-GS950/48 User Manual

Page 38

background image

Chapter 2: Installation

38

5. Position the switch on the wall and fasten with four screws, as

illustrated in Figure 8 on page 38.

Figure 8. Positioning the Switch onto the Wall with Mounting Screws

6. If you plan to install SFP transceiver modules, go to “Installing an SFP

Transceiver” on page 42. Otherwise, your next step is “Cabling and
Powering On the Switch” on page 44.

1764