beautypg.com

Unpacking the switch – Allied Telesis AT-GS950/48 User Manual

Page 34

background image

Chapter 2: Installation

34

Unpacking the Switch

To unpack the switch, perform the following procedure:

1. Remove all components from the shipping package.

Note

Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.

2. Place the switch on a level, secure surface.

3. Ensure that the following hardware components are included in your

switch package. If any item is missing or damaged, contact your Allied
Telesis sales representative for assistance.

One AT-GS950/48 Gigabit Ethernet Smart switch and the following:

ˆ

Mounting brackets - 2 pieces (1set)

ˆ

Rack mounting screws - 8 pieces (for bracket to device)

ˆ

Rack Mounting screws - 4 pieces (for bracket to rack)

ˆ

Wall mounting anchors - 4 pieces

ˆ

Wall mounting screws - 4 pieces

ˆ

Rubber feet - 4 pieces

ˆ

One power cord