beautypg.com

Figure 43: plugging in the ac power cord – Allied Telesis x310 Series User Manual

Page 92

background image

Chapter 7: Powering On the Stack

92

Figure 43. Plugging in the AC Power Cord

Warning

Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.

E3

Note

Pluggable Equipment. The socket outlet shall be installed near the
equipment and shall be easily accessible.

E5

2. Wait one minute for the switch to initialize its management software.

The switch should be displaying the number 1 on its ID LED.

3. Power on the switch to be assigned ID number 2.

4. Wait two minutes for the new switch to join the stack as a member.

As the new switch boots up, the first switch, which has the ID number 1
and at this point is the master switch of the stack, notifies the new
switch that its current ID number is already being used and that it
should change its number to the next available number, which is 2.
The new switch responses by automatically changing its ID number to
2 and reboots. So the new switch is actually booting up twice, once
with the ID number 1 and again with its new ID number 2, which is why
it takes two minutes before the device becomes a full member of the
stack.

5. If there is a third switch, power it on and wait another two minutes for it

to join the stack as a member with the ID number 3.