beautypg.com

Planning, Tools required, Materials required – Outback Power Systems GS Load Center Installation Manual User Manual

Page 11: Location/environmental requirements

background image

900-0123-01-00 Rev B

9

Planning

Tools Required

 Open-ended wrenches (9/16" and13 mm)
 Wire cutters/strippers
 Torque wrenches
 Assorted insulated screwdrivers
 Digital Voltmeter (DVM) or regular voltmeter

Materials Required

 Conductors for wiring
 Conduits

Location/Environmental Requirements

 Indoor mount only

Figure 7

Dimensions

8½" (21.6 cm) deep

16" (40.6 cm) wide

17"

(43.2 cm)

high

Side View

Front View