beautypg.com

Routing cables from the shelter, Using the universal shelter with a solar power kit – DAVIS Universal Shelter (6618) User Manual

Page 4

background image

3

Routing Cables from the Shelter

If you mount a cabled console or Envoy in the shelter, or are using the shelter with
a Solar Power Kit, or otherwise need to route cables from inside the shelter, follow
these steps:

1. Remove one of the rubber plugs from the floor of the

shelter.

2. Feed the cable down through the hole.
3. Outside the shelter, wrap a split grommet around the cable.
4. Push the grommet securely into the hole in the floor of the

shelter.

Using the Universal Shelter with a Solar
Power Kit

For some installations, you will need both a Solar Power Kit and a Universal
Shelter. For example, if you wish to power a cabled Vantage Pro2 console, you
will need a Heavy Duty Solar Power Kit. However, there is not enough room in the
kit’s shelter for both the large battery and the console. You will need to mount your
console in a Universal Shelter and connect it to the Heavy Duty Solar Power Kit.

1. Install the console in the Universal Shelter.

Use oval-hole

gromment with

flat cables or

power cable.