beautypg.com

Remove the rain collector cone if it is installed – DAVIS Rain Collector for Vantage Pro2 (with grip grooves and bird spikes) User Manual

Page 4

background image

Installing the Rain Collector on a Post or Flat Surface

4

Note: Climbing on your roof may be hazardous. If you are uneasy about installing your unit

please have a qualified professional complete the installation. Davis specifically disclaims
any liability for injury or loss resulting from the installation or use of the rain collector.

Installing the Rain Collector on a Post or Flat Surface

Refer to the following illustration to install the rain collector on a post or flat,
vertical surface.

Backing Plate

1/4" x 3"

Lag Screws

40' Cable

(For clairty, the tipping
mechanism is not shown.)

1. With a 3/16" (5 mm) drill bit, drill two holes approximately 2

1

/

8

" (54 mm) apart.

Use the metal backing plate as a guide when marking the holes and a carpenter’s
level to ensure the holes are level.

2. Remove the rain collector cone if it is installed.
3. Insert the 1/4" x 3" lag screws through the metal backing plate and the holes in the

mounting base into the post. Make sure the base is level by checking the built-in
bubble level.

4. Tighten the lag screws using an adjustable wrench or 7/16" wrench.