beautypg.com

DAVIS Solar Power Kit for Non-Vantage Pro Stations User Manual

Page 7

background image

Installing the Regulator Circuit

Page 7

Installing the Battery in other shelters or locations

1. Connect the battery cable harness wires to the battery terminals (see illustration

“Attaching Battery Cable” on page 6.)

Be sure to connect the red wire to the positive (red) terminal and the black
wire to the negative (black) terminal.

2. Place the battery on a horizontal surface.

I

NSTALLING

THE

R

EGULATOR

C

IRCUIT

The instructions below explain how to install the regulator circuit in the Com-
plete System Shelter (CSS).

1. Align the spacer posts at each corner of the regulator circuit over the holes in the bat-

tery cover plate.

Make sure to orient the regulator circuit so the words printed on the circuit
board are right side up.

2. Using firm but gentle pressure, push the charge circuit assembly down until the

spacer posts are firmly seated in the holes.

3. If you plan to mount the station console in the CSS, insert the #4-40 x 1/2” (15 mm)

screws into the nylon insulators and attach to the battery cover plate as shown below.

Do not use the self-tapping screws and nylon insulators supplied with the
CSS. The point on the self-tapping screws may inadvertently puncture the
battery. If the battery is installed in the CSS you must use the #4-40 x 1/2”
(15 mm) screws and nylon insulators supplied with the battery.

A

TTACHING

R

EGULATOR

C

IRCUIT

AND

C

ONSOLE

S

CREWS

TO

B

ATTERY

C

OVER

P

LATE