Lokar Automatic Trans Mount Shifter Ford AOD, 4R70W, and AODE User Manual
Page 3

Step 8: (Continued) Transfer that measurement to the transmission (or to the engine/transmission assembly if
the engine is not installed in the vehicle). Mark that location on the shifter's main plate. The holes in
the main plate that are closest to your mark are where the
FRONT banana bracket bolts will need to be
installed.
Fig. 5
If you choose to install the shifter assembly where any of its mounting holes line up with the left,
right, or rear bracket mounting bolts, mount the shifter using the same bolts and lock washers that are
already being used to attach the left, right, or rear mounting brackets to the main plate. In this case,
the bolts will go through the banana bracket first, then the main plate, and finally into the mounting
bracket below.
Any shifter mounting holes that do not line up with the side or rear mounting bracket bolts must use
the provided 5/16"-24 x 1/2" button head bolts and nylock nuts
(NO lock washers). Make sure the
shifter assembly is mounted using all four bolt holes.
Do not use any other length bolts. Fig. 5
NOTE: If mounting the shifter all the way forward using the four bolt holes at the very front of the main
plate,
a bell crank kit (Lokar Part No. S-68159, sold separately) will be required. Fig. 5
If mounting the shifter at the rear of the main plate,
on some transmissions it will be necessary to trim
the large casting boss on the left side of the transmission case just in front of the tailhousing, in order to
allow full travel of the quad lever on the shifter.
Step 9: If your vehicle does not already have an existing shifter opening, cut the opening now. If you are using
a Lokar shifter boot, the maximum opening for a round boot is 4" in diameter, and the maximum
opening for a rectangular boot is 4" wide by 5-1/2" long.
Before proceeding any further, the transmission should be installed in the vehicle, with the vehicle body,
seat and dashboard in place.
Fig. 6
Fig. 5
Fig. 4
Page 3
Right Side
Bracket
Shifter
Assembly
Quad Lever at
Approximately
4:30 - 5:00 Position
(Step 11)
Banana
Bracket
5/16"-24 x 5/8"
Tension Set
Screws with
Jam Nuts
(4 Wheel Drive Only)
5/16"-24 x 3/8”
Button Head Bolts
1/2"-20 x 1"
Tension Set
Screw With
Jam Nut
Rear Mounting Bracket
(2 Wheel Drive Only)
Quad
Lever
Banana
Bracket
Center of Shifter
aligns with front
Banana Bracket
Bolt Hole
If Shifter is mounted in this
location, Lokar Bell Crank Kit
# S-68159 will be required.
Left Side
Bracket
6
12
3
9