3 steps for performing a migration, Steps for performing a migration, Figure 7-2 ill – HP StorageWorks XP10000 Disk Array User Manual
Page 59

59
Figure 7-2
Migration and Operations at a Web client
7-3 Steps for Performing a Migration
You can perform migration that is either concurrent to migration task registration or subsequent to migration
task registration. You can also change the migration target volume before the migration task is registered.
IMPORTANT:
After you create a migration task, do not change the configuration of volumes in the storage
subsystem until the migration task finishes. If you do, a migration might fail or have unintended results. For
example, if Remote Web Console or Device Manager changes the migration source volumes to LUSEs after
a migration task is created, only some of the LDEVs in the LUSE volume are migrated, and then those
LDEVs become incomplete LUSE volumes.
To perform a migration:
1.
In the Navigation frame, select the Migration Groups object.
The information frame displays the List Objects-Migration Groups subwindow, as shown in Figure 7-3
below.
Performing a
Migration