beautypg.com

Second processor option – HP ProLiant ML350e Gen8 v2-Server User Manual

Page 39

background image

Hardware options installation 39

7.

Install the access panel (on page

26

).

8.

Return the server to an upright position.

9.

Lock the front bezel (on page

24

).

10.

Connect each power cord to the server.

11.

Connect each power cord to the power source.

12.

Power up the server (on page

23

).

Second processor option

The server supports single-processor and dual-processor operation.

CAUTION:

To avoid damage to the processor and system board, only authorized personnel

should attempt to replace or install the processor in this server.

CAUTION:

To prevent possible server malfunction and damage to the equipment, multiprocessor

configurations must contain processors with the same part number.

IMPORTANT:

If installing a processor with a faster speed, update the system ROM before

installing the processor.

To install the component:

1.

Power down the server (on page

23

).

2.

Remove all power:

a.

Disconnect each power cord from the power source.

b.

Disconnect each power cord from the server.

3.

Unlock the front bezel (on page

24

).

4.

Place the server on its side.

5.

Remove the access panel (on page

25

).

6.

If installed, remove the PCI air baffle (on page

27

).

7.

Remove the system air baffle (on page

28

).