beautypg.com

HP ProLiant ML350 G5 Server User Manual

Page 61

background image

Hardware options installation 61

128 MB supports RAID 0, 1, 5, and 10

CAUTION:

To prevent a server malfunction or damage to the equipment, do not add or

remove the battery pack while an array capacity expansion, RAID level migration, or stripe

size migration is in progress.

IMPORTANT:

The battery pack might have a low charge when installed. In this case, a POST

error message is displayed when the server is powered up, indicating that the battery pack is

temporarily disabled. No action is necessary on your part. The internal circuitry automatically

recharges the batteries and enables the battery pack. This process might take up to four hours.
During this time, the cache module functions properly, but without the performance advantage

of the battery pack.

NOTE:

The data protection and the time limit also apply if a power outage occurs. When

power is restored to the system, an initialization process writes the preserved data to the hard

drives.

To install the component:

1.

Power down the server (on page

17

).

2.

Do one of the following:

o

Open or remove the tower bezel, as needed ("

Open or remove the tower bezel

" on page

18

).

o

Extend the server from the rack (on page

17

).

3.

Remove the access panel (on page

19

).

4.

Install the cache module with integrated battery pack.

5.

Install the access panel (on page

20

).

6.

Do one of the following:

o

Close or install the tower bezel, as needed.

o

Slide the server back into the rack.

7.

Power up the server (on page

17

).

Refer to the option documentation for more information.