beautypg.com

7 making process water connections – Sterlco Royal Series Compact Temperature Control Unit User Manual

Page 19

background image

Royal Series Water Temperature Control Units

Page 19

Deionized Water

Stainless steel (316 SS minimum) or PVC plastic components must
be used with deionized water. Sterling recommends stainless steel
because of the temperature constraints with plastic.


3-7 Making Process Water Connections

Closed Circuit/Direct Injection

On the back of each unit, the connections are labeled appropriately.
For Direct Injection units connect the

TO PROCESS

hookup to the

entrance of the process and the

FROM PROCESS

hookup to

the exit of the process. Connect the

COOLING WATER

IN

to your plant water supply. Connect the

COOLING WATER

OUT

line to an open drain, or to the return line of

your central water system.

For Closed Circuit units make the connections as stated above, and
if there is a separate supply for the process and cooling make the
following connections. Connect the PROCESS WATER
SUPPLY
hookup to the water source for the process. Connect the
PROCESS WATER VENT hookup to return the water back to
the process source.

Make sure you carefully select the connecting lines and
connectors between the temperature control unit and the
process to suit the needs and requirements of your application.

If your unit has a maximum operating temperature of 250ºF
(121ºC), the connecting lines and connectors should have a
service rating of at least 250ºF (121ºC) and 150 psig (1,034.25
kPa/10.34 bars). If it has a maximum temperature of 300ºF
(149ºC), the lines and connectors should have a service rating
of at least 300ºF (149ºC) and 150 psig (1,034.25 kPa/10.34
bars).


TO PROCESS — 1½” NPT

This is the outlet for the tempered water leading to the process
being controlled.


This manual is related to the following products: