Connections, Product unpacking and inspection, Installation – Badger Meter MC4000 Diagnostic Test Equipment User Manual
Page 10: Connections 10, Product unpacking and inspection 10, Installation 10, T2 t1

ConneCTIonS
CONNECTIONS
Pt-100
S+
E+
E-
Flow
Sensor
Excitation
P1
GND
S-
11 V
to GND
(+)
(-)
10 mV
4-20 mA
P2
RPM Pulses
GND
GND
4-20 mA
8
6
7
3
5
2
4
1
8
6
7
3
5
2
4
1
T2
T1
T1
T2
1
2
4
5
3
Figure 5: MC4000 controls and connections
1
Hole
Hardware reset
2
Indicator
Battery charging
T2
Connector
Auxiliary pressure sensor
T1
Connector
Flow, pressure and temperature sensors
3
Keypad
Keypad
4
Socket
Battery charging
5
Port
USB–B
PRODUCT UNPACKING AND INSPECTION
Upon receipt of the product, perform the following unpacking and inspection procedures
OTEE:
N
If damage to the shipping container is evident upon receipt, request the carrier to be present when the product
is unpacked
Carefully open the shipping package, follow any instructions that may be marked on the exterior Remove all cushioning
material surrounding the product and carefully lift the product from the package
Retain the package and all packing material for possible use in reshipment or storage
Visually inspect the product and applicable accessories for any physical damage such as scratches, loose or broken parts or
any other sign of damage that may have occurred during shipment
OTEE:
N
If damage is found, request an inspection by the carrier’s agent within 48 hours of delivery and file a claim with the
carrier A claim for equipment damage in transit is the sole responsibility of the purchaser
INSTALLATION
Check the interior of the meter for foreign material Ensure the turbine rotor spins freely prior to installation Additionally
check and clear fluid lines of all debris
Page 10
Month 2014