beautypg.com

3 required tools, Required tools, Table 10: tools – Spectrex 40/40UFL Ultra Fast UV/IR User Manual

Page 33: Certification instructions

background image

TM 40/40UFL, Rev (2) August 2013

Required Tools

21

2.3

Required Tools

The detector can be installed using general-purpose common tools and
equipment. Table 10 lists the specific tools required to install the detector.

Table 10: Tools

Tool

Function

Hex Key ¼ inch

Mount the detector on the tilt mount

Hex Key

3

/

16

inch

Open and close detector cover (for wiring)

Flat Screw Driver 4 mm

Connect ground terminal

Flat Screw Driver 2.5 mm

Connect wires to the terminal blocks

For wiring, use color-coded conductors or suitable wire markings or labels.
12 to 20 AWG (0.5 mm² to 3.5 mm²) wires may be used for site wiring. The
selection of wire gauge should be based on the number of detectors used on
the same line and the distance from the control unit, in compliance with
specifications (see General Instructions for Electrical Wiring on page 49).