beautypg.com

GW Instek LCR-914 User Manual

Page 18

background image

LCR-914/915/916 User Manual

16

When “OPEn” appears on the sub display, make the terminal or
the SMD test probe open, and press the CAL button to start the
open calibration. About 30 seconds later, the result of the open
calibration appears on the main display. If the result is

“pass”,

press the CAL button to proceed to the next step. If the result is
“fail”, press the CAL button to exit the function.

This manual is related to the following products: