Caution, Warning, Maintenance – Edwards Signaling 105DHIST-FJ User Manual
Page 2: Figure 1. mounting cat. no. 105bm mounting bracket

P/N 3100394 ISSUE 3
Figure 3. Securing the 105DHIST Series Beacon
to the 105PM Pipe Mount Attachment
CAUTION
Do not touch the strobe tube or halogen bulb with
bare fingers. Grasp the light source either by the
base or using a soft, clean cloth.
(4) Screws to mount
lens to 105PM
(supplied)
105HI-L Series
Lens
Hi-Intensity Strobe Base
Adhesive backed
gasket
105PM Pipe Mount
Attachment
3/4” (19 mm) Conduit
Nipple
Figure 1. Mounting Cat. No. 105BM Mounting Bracket
Adhesive backed
gasket
105BM Mounting
Bracket
(4) Screws to mount
105BM to 105BX
(supplied)
Adhesive backed
gasket
(2) Screws to mount
105BX to the
mounting surface
Mounting
Surface
(4) Screws to mount
lens to 105BM
(supplied)
105HI-L Series
Lens
Hi-Intensity Strobe Base
Maintenance
The lens should be periodically cleaned using a mild detergent and
water on a soft, clean, lint-free cloth.
Light Source Replacement
WARNING
To prevent electrical shock, before starting work on
units disconnect power and, for strobe modules
wait 5 minutes for stored energy to dissipate.
Strobe tube
Strobe tube base
Strobe tube
socket
105-L Series
Lens
Beacon Base
Gasket
Figure 2. Strobe Tube Replacement
1. Unscrew the lens from the base.
2. For Strobe Tube Replacement:
a. Grasp the strobe tube by its base and pull straight up out
of the strobe tube socket (Figure 2).
b. Grasp the new strobe tube by the strobe tube base and
press into the strobe tube socket.
3. Ensure that the clear gasket is on the base with the flared, open
end facing down. Screw the lens onto the base.
4. Apply power and verify operability.