beautypg.com

Document updates – Triton RT2000 X2 Installation Manual User Manual

Page 2

background image

2

M

ODEL

RT2000 (X2) I

NSTALLATION

G

UIDE

W

HAT

S

IN

THIS

I

NSTALLATION

G

UIDE

†

S

ITE

C

OMPLIANCE

. States the customers responsibilities for ensuring all relevant regulations, codes,

and laws are adhered to for installing ATMs.

†

ATM E

NVIRONMENTAL

P

RECAUTIONS

C

HECKLIST

. Describes the general environmental precautions and

HOHFWULFDO VSHFL¿FDWLRQV DUH FRQVLGHUHG ZKHQ LQVWDOOLQJ WKH $70 7R KHOS HQVXUH SURSHU RSHUDWLRQ RI
the ATM, ensure the environmental criteria listed in this checklist are met.

†

D

IMENSIONS

. Describes physical dimensions for the cabinet(s), control panel components, and signage.

¾

Physical dimensions.

¾

Service area dimensions.

¾

Customer access dimensions

†

I

NSTALLATION

. Describes site preparation for exterior wall or vestibule locations. Instructions provide

the physical dimensions of the cabinet and associated hardware items.

Optional platforms (“plinths”)

available in 2 sizes expedite raising the unit, if needed: 3” [76mm] or 6” [152mm].

I

NTRODUCTION

†

P

OWER

AND

C

OMMUNICATION

. Shows cable access area, power requirements, and powering-up the unit.

†

A

PPENDIX

A. Software License Agreement / Compliance/Emissions statements

†

A

PPENDIX

B. ATM Installation for Accessibility guidelines.

†

I

NSTALLING

/C

ONNECTING

THE

R

EAR

O

PERATOR

S

ERVICE

P

ANEL

(RSP). Describes how to install and

connect the RSP.

The Triton RT2000 is a self-serviced, weatherized terminal adaptable for any suitable exterior (or interior)
wall or vestibule location. The cabinet design allows installation for maximum wall thickness up to 11-1/2”
[279mm]. Built-in leveling feet and optional platforms (“plinths”) allow the unit to be raised to the desired
height of the wall opening. The following section provides the physical dimensions and requirements for
installing the RT2000 for your particular site location. To assist you in preparing your site, a check list is
provided of various procedures that should be carried out prior to the arrival of the ATM.

DOCUMENT UPDATES:

Dec 11 2009 Page 30-31 Added warning to install RSP properly