Warning – Triton RT2000 X2 Installation Manual User Manual
Page 17
17
M
ODEL
RT2000 (X2) I
NSTALLATION
G
UIDE
I
NSTALLING
C
ABINET
T
HROUGH
W
ALL
O
PENING
1. Carefully inspect the unit for any shipping damage and report
any damage immediately to the shipping company. Refer to
the warranty information in the User manual for information
about reporting shipping damage.
2. After unpacking the unit, move the cabinet using the proper
lifting/moving device to the wall opening.
Slide unit up to interior wall.
*Important*
DO NOT install the control
panel fascia at this time.
3. Slide the unit up to the opening until the sleeve portion of the
cabinet is near the wall.
4. Measure the distance from the bottom of the wall opening to
the bottom of the sleeve. This will be the height requirement
of the “plinth”, if needed. Add an additional 1/2” (12 mm) to
your measurement for clearance
Note
A “plinth” is a platform on which the
ATM rests or is secured. This plinth
enables the ATM to be installed at
the required height through the wall.
5. If
no plinth is required, slide the unit forward towards the wall
opening so the sleeve protrudes slightly out the front exterior
7KLV LV QHHGHG WR WHPSRUDULO\ DI¿[ WKH FRQWURO SDQHO WULP
Minor adjustments for raising/leveling the unit can be made
using the cabinet leveling feet. Proceed to Step 8.
*** WARNING ***
The RT2000 unit is top heavy. USE EXTREME
CAUTION! Always move/support the unit from
the FRONT! 2-personnel are recommended when
unpacking and moving the unit!!
Measure from bottom of wall open-
ing to bottom of sleeve.