beautypg.com

9100 i – Triton 9100 Installation Manual User Manual

Page 2

background image

2

M

ODEL

9100 I

NSTALLATION

M

ANUAL

This manual gives step-by-step procedures for completing the physical installation of a Model 9100 ATM.

This manual is divided into the following sections:

!

ATM E

NVIRONMENTAL

/ P

OWER

P

RECAUTIONS

C

HECKLIST

. Describes the general environmental and

power requirements when installing the ATM. To help ensure proper operation of the ATM, ensure the
environmental criteria listed in this checklist are met.

!

C

ABINET

D

IMENSIONS

. Displays the dimensions for the cabinet(s), exterior control panel components,

and signage.

!

I

NSTALLATION

- S

TANDARD

/C

HEMICAL

A

NCHORS

. Describes how to install the cabinet assembly using

standard (steel) or chemical anchor bolts.
Note: The anchor kits are NOT included with the unit. You must purchase these optional anchor
install kits.

!

D

ISPENSING

M

ECHANISM

I

NSTALLATION

. Describes how to install the TDM-100, SDD, and Minimech

dispensing mechanisms into the ATM security cabinet.

!

P

OWER

AND

C

OMMUNICATION

. Describes how to route the ATM to the facility power and communication

connections.

* NOTICE *

The Model 9100 ATM supports most models of TDM mechanisms (TDM-
100/150/200/250) including the Minimech and SDD. The TDM-100, SDD, and
Minimech are shipped separately and must be field installed. The rest of the
TDM family are shipped installed in the cabinet.

W

HAT

S

IN

THIS

I

NSTALLATION

G

UIDE

!

A

PPENDIX

A. Software License Agreement / Compliance/Emissions statements

!

A

PPENDIX

B. ATM Installation for Accessibility guidelines.