1 assembling 2000 kva sscs, 2 ip 32 option, Appendices – APC GALAXY 7000 User Manual
Page 58
![background image](/manuals/36396/58/background.png)
34020846EN/AD
- Page 58
2. Appendices
2.1 Assembling 2000 kVA SSCs
2.2 IP 32 option
Refer to the "IP 32" manual no. 3460028300 for more details on this option
1 - Place the cabinets in their definitive
position
2 - Adjust the front feet to ensure the
cabinets are vertical and the doors
aligned.
3 - Remove the two inter-cabinet
uprights (1) located behind the right
hand side cabinet.
3 - Unbolt the 7 fishplates (2) (3) (4)
4 - Align the fishplates horizontally
5 - Fit the 3 upper-part fishplates L1, L2,
L3 (2) between the 2 cabinets
6 - Fit the neutral fishplate (3) between
the 2 cabinets
7 - Fit the 3 lower-part fishplates L1, L2,
L3 (4) between the 2 cabinets
8 - Connect the the two earthing braids
(5) between the front uprights of both
cabinets
9 - Connect the auxiliary wires between
the connectors (6) of both cabinets
10 - Fit the inter-cabinet uprights (1)
between the two cabinets
1
1
Right hand side cabinet
Rear view
12
11
15
13
14
6
X 3
X 3
X 1
2
3
4
Left hand side cabinet
Right hand side cabinet
Side view