beautypg.com

Top view, Install spray line – Hired-Hand Mega-Cool: Square Reservoir User Manual

Page 9

background image

Part No. 4801-5397 Rev. 5-08

Mega-Cool System – Square Reservoir

Page 9

1

2

3

































































Install Spray Line

1. Glue spray line sections together. Important! Glue joints with

spray line holes pointed in the same direction. Allow glue to
dry. The spray line must have a tee joint in the middle. Be
sure to point tee section at 90° to holes in line. Refer to the
Center-Mount System Diagram on Page 15. Spray line tee
installation will be simplified if the spray line is cut after the
In-Line Pump & supply line is plumbed and the correct tee
placement verified.

2. Insert spray line assembly into one end of top bracket. Slide

assembly until spray line spans entire length of top bracket.

3. Rotate spray line to place holes facing upward. (NOTE: Side

View shown at left).

Rotate spray line
To point holes
upward.

Assemble Spray

i

Lay Spray Line Into Top Support Brackets

Spray Line Installed With Holes Upward

TOP VIEW

TOP VIEW

Be sure to point holes in the same
direction when gluing Spray line.

Be sure to point tee section at 90°
to holes in line.