beautypg.com

Assemble end caps – Hired-Hand Mega-Cool: Square Reservoir User Manual

Page 12

background image

Part No. 4801-5397 Rev. 5-08

Mega-Cool System – Square Reservoir

Page 12

6” PAD ONLY:

Assemble Left Hand and Right Hand Top
and Bottom System End Cap Sections
together using ¼-20x1/2" stainless steel
bolts and ¼-20 stainless steel nuts
provided as shown above to the desired
height.

NOTE: Top Section without bottom section
used for 3 ft. high pads.

System End Cap assembly:
Top holes in top section adjust height for 4
ft. pads.

Second set of holes from the 4 ft. holes
adjust height for 5 ft. pads.

Third set of holes from the 4 ft. holes
adjust height for 6 ft. pads.

Bottom set of holes adjust height for 2
meter pads.

Install Caps (0006-5024) in unused bolt
holes.

4 ft. Pads

5 ft. Pads

6 ft. Pads

2 meter Pads

Top Section

Top Section

Bottom Section

Bottom Section

NOTE: Illustration

shows lineup for 5

ft. Pads.

¼-20x1/2"

Stainless

Steel Bolts

¼-20x1/2"
Stainless
Steel Bolts

¼-20
Stainless
Steel Nuts

¼-20

Stainless

Steel Nuts

#10x 1”
TEK Screws

NOTE: Install Caps

(0006-5024) in all

unused bolt holes.













































































Assemble End Caps

Assemble Top Section to
Inside of System End

Right End Cap

Left End Cap