HATZ Diesel 4M42 User Manual
Page 71

NOTICE
i
Operation of the engine for a lengthy period without a load or
with only a small load can result in premature deposits on the
screen insert.
Shorten the maintenance interval accordingly.
Overview
Pos.
Designation
1
Pipe clamp
2
Screen insert
Procedure
Step
Activity
1
Release the pipe clamp (1) and remove it with the exhaust
pipe.
2
Remove deposits on the screen insert (2).
3
Check the screen insert for cracks or breakage, and replace if
necessary.
2-4L41C, 2-4M41, 2-4M41Z, 4L42C, 4M42
Maintenance
HATZ
Operator's Manual
71