Brocade DCX 8510-8 Backbone Hardware Reference Manual User Manual
Page 5

Removing a core switch blade (CR16-8)............................................ 90
Replacing a core switch blade (CR16-8).............................................92
Power supply removal and replacement......................................................... 93
Time and items required..................................................................... 93
Identifying power supplies...................................................................93
Removing a power supply...................................................................94
Replacing a power supply................................................................... 95
Blower assembly removal and replacement................................................... 96
Time and items required..................................................................... 96
Removing a blower assembly ............................................................ 96
Replacing a blower assembly............................................................. 97
WWN card removal and replacement............................................................. 97
Time and items required..................................................................... 98
Verifying the need for replacement..................................................... 98
Preparing for the WWN card replacement.......................................... 98
Removing the WWN card and WWN bezel (logo plate)......................99
Replacing the WWN card and WWN bezel (logo plate)....................101
Transceiver removal and replacement..........................................................101
Time Required...................................................................................102
Items Required..................................................................................102
Removing an SFP+ transceiver........................................................ 102
Replacing an SFP+ transceiver.........................................................103
Removing and replacing an mSFP optical transceiver..................... 104
Removing and replacing a QSFP optical transceiver........................105
Qualified transceivers for the FC16-64 port blade and the core
blades.......................................................................................... 106
Inter-chassis link (ICL) cable removal and replacement............................... 106
Brocade DCX 8510-8 chassis removal and replacement............................. 111
Time and items required................................................................... 112
Faulty Brocade DCX 8510-8 chassis indicators................................112
Recording critical Brocade DCX 8510-8 and SAN information......... 113
Disconnecting from network and fabric............................................. 115
Removing components from the chassis.......................................... 116
Installing the replacement chassis.................................................... 116
Installing components into the new chassis...................................... 117
Downloading the configuration..........................................................118
Verifying correct operation of system................................................118
Reconnecting the system to the network and fabric......................... 120
Verifying correct configuration of the fabric.......................................120
Cable routing table............................................................................ 121
General specifications...................................................................................125
System architecture...................................................................................... 126
System size and weight................................................................................ 128
System blade and FRU weights....................................................................128
Facility requirements..................................................................................... 129
Environmental requirements......................................................................... 130
Fibre Channel port specifications..................................................................130
Power specifications..................................................................................... 131
Power cords.................................................................................................. 133
Power-cord notice............................................................................. 136
Brocade DCX 8510-8 Backbone Hardware Reference Manual
5
53-1002180-07