Engineering, 1 installation, 1 preparation – Yokogawa GC1000 Mark II Process Gas Chromatograph User Manual
Page 14: 2 initial setting, Engineering -1, 1 installation -1, Preparation -1, Initial setting -1

<4. Engineering>
4-1
IM 11B06E01-01E
4. Engineering
ASGW requires the engineering at installation, modification and address mapping.
The install procedure of FCJ is referred to “STARDOM FCN/FCJ Software Installation” (IM
34P02Q91-01E), and “STARDOM FCN/FCJ Guide” (IM 34P02Q01-01E).
4.1 Installation
This section explains the setup of ASGW, license registration, loading of the application software
and initializing of IP address.
4.1.1 Preparation
l
Installation of the engineering tool
Install the resource configurator software from CD-ROM (NT203AJ-PC11E) to PC.
Resource configurator software is an engineering tool for STARDOM FCN/FCJ.
l
Installation of the ASGW software
Set the ASGW application software CD on PC.
Uncompress the following compressed file on PC.
(CDR)/ASGW/INSTALL_ASGW.ZIP
Confirm the following folder is created.
[Uncompressed folder]/INSTALL_ASGW
4.1.2
Initial setting
l
Loading the license file
Download the ASGW license file from the STARDOM license publishing web site.
Refer to D1. License in “STARDOM FCN/FCJ Guide (IM 34P02Q01-01E) about the license.
4th Edition : Nov. 22, 2011-00