beautypg.com

Installation, A-14 – Lincoln Electric IM10022 POWER WAVE AC_DC 1000 SD User Manual

Page 23

background image

A-14

INSTALLATION

POWER WAVE

®

AC/DC 1000

®

SD

A-14

PARALLEL CONNECTION CHECKLIST (See Figure A.8)

Place the Power Wave

®

AC/DC 1000

®

SD units in a suitable operating location.

Mount MAXsa™ 10 Controller.

Install MAXsa™ 22 Wire Drive and other accessories in their operating location.

The MAXsa™ Controller must be connected to the Master Power Source. Connect K2683-xx Heavy Duty
ArcLink Control Cable (5 pin) between Power Wave and MAXsa™ 10 controller.

Connect K1785-xx Wire Feeder Control Cable (14 pin) between the MAXsa™ 10 controller and the MAXsa™
22 feeder.

Connect a K1785-xx Wire Feeder Control Cable (14 pin) between the two power sources (top connectors).

Install Electrode Sense Lead (67) at the feeder and the Work Sense Lead (21) from the Lead Power Wave

®

AC/DC 1000

®

SD Master per guidelines.

Connect / Install welding cables to both the “master” and “slave” machine per recommended "Output Cable
Guidelines" (Table A.1).

Open the Power Wave

®

AC/DC 1000

®

SD front panels and configure DIP switch settings per the decal on the

panel. (See Figure A.4).

Connect input power to Power Wave

®

AC/DC 1000

®

SD units per recommended guidelines.

Turn on Power Wave

®

AC/DC 1000

®

SD, and verify all system Status Lights are solid green.

Confirm that latest software is updated in all equipment prior to installation (www.powerwavesoftware.com)

For tandem setups, run the subarc cell configurator from PC Tools (See Section C of this manual or go to
www.powerwavesoftware.com).

Select a Welding process and configure starting and ending options.