beautypg.com

Installation, Placement & rigging – Fulton Pulse HW (PHW) Fully Condensing Hydronic Boiler User Manual

Page 9

background image

Questions? Call (315) 298-5121, or visit us online at www.fulton.com

SECTION 2

PHW-IOM-2013-0214

INSTALLATION

2-3

STANDARD TRIM

The following items are standard trim for Fulton Pulse Combustion Hydronic
Boilers:

Microprocessor Based Control - 120 volt with built-in operating and high

limit controls, and separately wired dual element sensor

Low Water Cutoff (Probe Type)
Control Panel Completely Wired with Diagram
Gas Pressure Switches
Spark Ignition
Factory-Assembled and Mounted Fuel Train
Flame Rod

PACKAGED SEPARATELY

Included with and packaged separately with each boiler are the following
components:

ASME Pressure Relief Valve
Pressure-Temperature Gauge
Air Intake Pipe Adaptor
Installation, Operation, and Maintenance Manual
Elastomer Coated Fiberglass Cubes or Springs For Mounting
Gas and Water Flex Connectors
Intake and Exhaust Muffl

ers

1 Can Touch-up Paint

OTHER ACCESSORIES

Other items that may be included are:

Condensate Drain - one condensate drain kit can accommodate the

condensate from up to 12 MM BTUs.

PH Neutralization Kit

Placement & Rigging

Proper placement of your Fulton product is essential. Correct placement is the
fi rst step to trouble-free installation, operation, and maintenance.

Adhere to the following for placement and rigging:

1. Check building specifi cations for permissible fl oor loading. Use Table 1 for

unit reference.

2. Conform to all the requirements of all national, state and local codes

established by the authorities having jurisdiction and/or the U.S. to the
National Fuel Gas Code, latest edition. Authorities having jurisdiction
should be consulted before installations are made. Where required by local
codes, the installation must conform to American Society of Mechanical
Engineers Safety Code for Controls and Safety Devices for Automatically
Fired Boilers (ASME CSD-1).

3. Since an external electrical source is utilized, the boiler, when installed,

must be electrically ground in accordance with the National Electric Code,

!

WARNING

All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct, and strict
adherence to applicable jurisdictional/
professional codes and regulations.

Competent personnel in accordance
with all applicable local codes should
carry out the installation of the Fulton
equipment. All state and jurisdictional
codes beyond the scope of the applicable
ASME Boiler and Pressure Vessel Codes,
for its corresponding classifi cation, should
be followed in all cases. Jurisdictional
authorities must be consulted prior to
installation.

A competent rigger experienced in
handling heavy equipment should handle
rigging your equipment into position.

The equipment must be installed on a
non-combustible surface.

Failure to provide required and safe
access to the equipment could impede
commissioning and maintenance.
Service technicians are instructed not to
commence commissioning if hazardous
conditions exist.

Failure to provide proper minimum
clearances between equipment and
combustible materials may result in fi re.

4

CAUTION

Do not allow weight to bear on equipment

components to prevent damage.