beautypg.com

Installation, Horizontal vent termination – Fulton Pulse HW (PHW) Fully Condensing Hydronic Boiler User Manual

Page 31

background image

Questions? Call (315) 298-5121, or visit us online at www.fulton.com

SECTION 2

PHW-IOM-2013-0214

INSTALLATION

2-25

FIGURE 19 - HORIZONTAL INSTALLATION WALL PENETRATIONS

intake and vent pipes are passed, then tighten securely.
They will prevent the intake and vent pipes from being
pushed or pulled.

Horizontal Vent Termination

Adhere to the following for horizontal vent terminations:

1. Join the vent termination to the vent pipe outside the

wall. Use the same joining procedures for vent pipe and
fi ttings.

2. Ensure the termination of the vent system is at least 12”

above the fi nished grade, or at least 12” above normal
snow accumulation level (for applicable geographical
areas). Refer to Figure 19. The termination of the vent
system shall not be located in traffi

c areas such as

walkways, adjacent buildings, openable windows and
building openings unless the venting system is at least