3 concrete pad and conduit locations, 4 securing operator to pad, Conduit locations concrete pad – Controlled Products Systems Group 6500-083 User Manual

Page 12

background image

11

6500-065-E-2-08

This depth of the
concrete pad is
determined by soil
conditions and local
building codes.

General Area

Under Electrical Box Knock-outs

Chassis
Obstruction

Approximate
Conduit Position

Once the location of the operator pivot point has been determined, construct a form for the concrete pad (reinforced concrete
recommended) approximately 22” wide by 28” long and 4” minimum above the ground. The depth of the pad underground is
determined by soil conditions and local building codes. Install any underground conduit running through the concrete pad (See
section 2.1, Conduit Requirements). Pour concrete and let it cure completely (48 hours).

1.3 Concrete Pad and Conduit Locations

22” Concrete Pad Width

28” Concrete Pad Length

Concrete pad MUST be level.
Note: Bevel the edges of
concrete pad to eliminate water
puddling under the operator.

4” minimum

Variable

22”

13”

Permanently attach the operator to the concrete pad
using four (4) 3/8” x 3” sleeve anchors (not supplied).

1.4 Securing Operator to Pad

12

1

/

8

15

7

/

8

11”

11”

Conduit Locations

Concrete Pad

Concrete Pad
22” x 28”

5”

4

1

/

4

5

1

/

2

” 5

1

/

2

7”

16

1

/

2

Switch Box

Obstruction

11”

5

1

/

8

¾-inch conduit with sweeps.