3 concrete pad and conduit locations, 4 securing operator to pad, Conduit locations concrete pad – Controlled Products Systems Group 6500-083 User Manual
Page 12
11
6500-065-E-2-08
This depth of the
concrete pad is
determined by soil
conditions and local
building codes.
General Area
Under Electrical Box Knock-outs
Chassis
Obstruction
Approximate
Conduit Position
Once the location of the operator pivot point has been determined, construct a form for the concrete pad (reinforced concrete
recommended) approximately 22” wide by 28” long and 4” minimum above the ground. The depth of the pad underground is
determined by soil conditions and local building codes. Install any underground conduit running through the concrete pad (See
section 2.1, Conduit Requirements). Pour concrete and let it cure completely (48 hours).
1.3 Concrete Pad and Conduit Locations
22” Concrete Pad Width
28” Concrete Pad Length
Concrete pad MUST be level.
Note: Bevel the edges of
concrete pad to eliminate water
puddling under the operator.
4” minimum
Variable
22”
13”
Permanently attach the operator to the concrete pad
using four (4) 3/8” x 3” sleeve anchors (not supplied).
1.4 Securing Operator to Pad
12
1
/
8
”
15
7
/
8
”
11”
11”
Conduit Locations
Concrete Pad
Concrete Pad
22” x 28”
5”
4
1
/
4
”
5
1
/
2
” 5
1
/
2
”
7”
16
1
/
2
”
Switch Box
Obstruction
11”
5
1
/
8
”
¾-inch conduit with sweeps.