beautypg.com

Controlled Products Systems Group 1042011577 User Manual

Page 9

background image

Page 9

November, 2003

400 Operator And
455 D Control Panel Installation Manual

Figure 5. Important mounting dimensions for outward

swing 400 operators, top view

Dimensions, In. (cm)

A

5 (13)

B

5 (13)

C

27

9/16

(70)

D

No Limit

E

Must be less than A

400 Standard, high speed,

and slow speed models

Re-attach the operator to the mounting brackets. Once

the operator is mounted and level, remove the vent

screw from the bottom of the rear flange. (See Figure 1)

Use the 3mm hex key on the end of the screwdriver

provided.


WARNING!

Failure to remove the vent screw

may result in erratic operation of the operator or

blown

seals.

Slowly move the gate open and close.


WARNING!

The piston should not bottom out in

either direction. Doing so will seriously damage

the

operator.

Be sure that the gate reaches the positive stop before

the piston bottoms out. Adjust the swivel joint if

necessary.

After checking the swing of the gate, secure all nuts and

bolts, including the jam nut on the swivel joint.

Once the operator is secure, attach the protective cover

to the front flange with the tie rods and end cap

provided.


Note

: Lubricating the threads of the protective

cover tie rods can prevent them from freezing up

and breaking if operator is ever removed for

service.

Once the protective cover is installed, swing the gate to

ensure that it does not contact the cover at any point of

the swing.

Re-engage the operator by inserting the key in the

locking cap (see Figure 3) and turning it clockwise until

snug. Remove the key.

This manual is related to the following products: