beautypg.com

455 d c, Ontrol, Anel – Controlled Products Systems Group 1042011577 User Manual

Page 14: On t r ol, Ns tal la t io n

background image

T

HE

455 D C

ONTROL

P

ANEL

G

ENERAL

D

ESCRIPTION

The FAAC 455 D control panel is used to operate the

following models.

Swing gate operators:

400

412

402

750

422

760

Barrier gate operators:

610/615

The 455 D programming controls the following:

Operating logic: A, S, E, EP, B, and C logics

available.

Reversing device behavior: Choose whether a

triggered reversing device during closing

immediately reverses gate movement or stops

the gate and reverses gate movement when no

longer triggered.

Caution: For all hydraulic operators, the torque

must be programmed to the maximum (50)

setting.

Pause time between opening and closing:

adjustable from 0 to 240 seconds.

O p e n i n g / C l o s i n g t i m e : a d j u s t a b l e

from 0 to 120 seconds.

Leaf delay on closing: adjustable from 0 to 28

seconds.

The 455 D control panel should be installed in an

enclosure that is conveniently located as close as

possible to the gate operator. All electrical

connections from the control panel to the operator

must be made in a weatherproof junction box.

The 455 D control panel requires a single-phase

power supply voltage (115 VAC [±10%] or 230 VAC

[+6 or -10%], 50–60 Hz). The power supply should be

protected by a 15 amp dedicated circuit breaker (not

provided).

The installer is responsible for grounding the operator

system, for providing the main power breaker switch,

and for making sure that the entire gate system meets

all applicable electrical codes. The installer should refer

to the installation manual for a given operator for more

information.

N

OTE

: An installation is U.L. compliant only

when you install the FAAC operators according

to the UL325 standards.

I

NSTALLING

THE

455 D C

ONTROL

P

ANEL

Locate the control panel in the most convenient position

possible, considering the movement of the gate.

Installing the control panel consists of the following

general steps:

Connecting the main power to the control
panel

Connecting the activating device

Connecting the operator to the control panel

Checking the direction of the motor's rotation

Connecting other devices to the control panel

Set operating modes

C

ONNECT

THE

M

AIN

P

OWER

S

UPPLY

WARNING!

Turn the main power off before you

make any electrical connections or before

programming.

Wire the main power supply to control panel terminals

in block J3 (see Figures 9 and 11). The installer is

responsible for insuring that a separate, grounded

circuit protected by a circuit breaker is between the

control panel and the main power supply. All wiring

should conform to applicable electrical codes, and all

wiring and fittings should be weatherproof and/or

suitable for burial.

Connect the ground to the grounding terminal in block

J3 and connect the power wires to the terminals labeled

N (neutral) and L (line).

N

OTE

: For a 230V system, a neutral is not

needed. Connect one 115V line to the L (Line)

and a second 115V line to the N (Neutral).

C

ONNECT

THE

O

PERATOR

(

S

)

TO

THE

Page 14

November, 2003

400 Operator And

455 D Control Panel Installation Manual

T

HE

455 D C

ON

T

R

OL

P

ANEL

I

NS

TAL

LA

T

IO

N

I

NS

TR

U

C

T

IO

N

S

This manual is related to the following products: