beautypg.com

Npacking, Perator – Controlled Products Systems Group 1042011577 User Manual

Page 5

background image

Page 5

November, 2003

400 Operator And
455 D Control Panel Installation Manual

U

NPACKING

THE

O

PERATOR

When you receive your 400 Operator, complete the

following steps.

Inspect the shipping box for physical damage such as

leaking oil or a torn carton. Then inspect the operator

after you remove it from the box. Notify the carrier

immediately if you note any damage. The carrier must

witness the damage before you can file a claim.

As you unpack the box, insure that all the following

parts included (see Figure 1). If you have ordered a kit

(a pair of operators), you will have twice the quantity

of parts listed below (except where noted), and you

will also have a radio receiver and two transmitters.

1 400 Operator - 1 each
2 Protective Cover - 1 each
3 Protective Cover Tie-Rods - 2 each
4 Protective Cover End Cap - 1 each
5 Rear Mounting Bracket - 1 each
6 Rear Mounting Plate (optional) - 1 each
7 Short Brass Pin with 8mm nut and washer - 1 each
8 Rear Fork - 1 each
9 Long Brass Pin with 8mm self-locking nut - 1 each

10 Swivel joint with jam nut and washer - 1 each
11 Front mounting bracket with nut and bolt
12 Locking cap cover and key for Manual Release - 1 each

Figure 1. Parts of the 400 Operator

This manual is related to the following products: