beautypg.com

455 d c, On t r ol, An el – Controlled Products Systems Group 1042011577 User Manual

Page 15: Nst a llat ion, Nst r uc t io n s

background image

RA

DI

O

1-455D115 = 115V

1-455D = 230V

F2

F1

M

M

K

+

OP

-

CL

+24 V

FSW

NC

-

B

-

STOP

A

+

TX

FS W

W. L.

LOCK

9

10 11 12 13 14 15 16 17 18 19

22 23 24 25

LAMP

COM OP

CL

MOTOR 1

MOTOR 2

CL

COM

OP

1

2

3

4

5

6

7

8

20 21

FC

A

1

FC

A

2

F

CC2

F

CC1

V1-4

61C455D

F

-

+

J2

J6

J4

J5

J1

J3

N

L

MAIN

Page 15

November, 2003

400 Operator And
455 D Control Panel Installation Manual

C

ONTROL

P

ANEL


WARNING!

Turn the main power off before

you make any electrical connections or before

programming.

C

AUTION

:

The operators are grounded only by

the grounded circuit the installer provides.

U

SING

A

J

UNCTION

B

OX

If an operator is more than 2 ft away from the control

panel, you must use a junction box for connection.

Use a U. L. Listed cord grip where the operator cord

enters the junction box.

Note: If you have a one-leaf gate design, the

operator must be connected to Motor 1

(terminals 1,2, & 3)

To wire up motor 1, connect the white wire to

terminal 1(on the J4 terminal strip), the black wire to

2, and the red wire to 3. Wire each leg of the capacitor

(supplied) to terminals 2 & 3.

Note: If you want to delay the closing of one gate

leaf in a two-leaf gate design, be sure to connect

its operator to Motor 1.

In order to wire motor 2 in a bi-parting system,

connect the white wire to terminal 4 (on the J4

terminal strip), the black wire to 5, the red wire to 6.

Wire each leg of the capacitor (supplied) to terminals

5 & 6.

C

HECK

THE

M

OTOR

S

D

IRECTION

OF

R

OTATION

WARNING! The pressure valves are not preset at

the factory and may operate a gate leaf with

enough force to endanger people and seriously

damage the gate leaf itself.

After you have connected the main power supply, and

the operator(s) to the control panel, you need to

check the direction of rotation for each operator

motor in your gate design.

Note: To check a motor’s direction of rotation,

you must have three closed circuits on terminal

block J1. Install one circuit between terminals 11

and 16, another circuit between terminals 12

and 19, and another circuit between terminals

13 and 19.

Figure 9. The 455 D Control Panel

J3 terminal block for main

power supply

J4 terminal block for

connecting the operator(s)

J1 terminal block for low-

voltage accessories

J2 quick connector port

F Function Push Button

— Programming Push

Button

+ Programming Push

Button

FUSES

220

VAC

115

VAC

F1

Main Power

5 A

10 A

F2

Accessories

800

mA

800

mA

T

HE

455 D C

ON
T

R

OL

P

AN
EL

I

N

ST

A

LLAT

ION

I

NST

R

UC
T

IO

N

S

This manual is related to the following products: