beautypg.com

455 d c – Controlled Products Systems Group 1042011577 User Manual

Page 10

background image

Page 10

November, 2003

400 Operator And

455 D Control Panel Installation Manual

1

5

3

6

8

2

4

9

7

3

5

1

A

A

B

A

B

C

C

D

A

Figure 7. The layout of a sample gate system

Locate switches at least

10 ft from the gate

1 Operator

Wire Gauges for Given Voltage

2 Control

Panel

220 VAC

115 VAC

3 Photocell

A 2

×

18 AWG

A 2

×

18 AWG

4 Switch

B 4

×

14 AWG

B 4

×

14 AWG

5

Junction box (see text)

C 5

×

18 AWG

C 5

×

18 AWG

6 Reversing

edges

D 4

×

14 AWG up to 414 ft

D 3

×

14 AWG up to 130 ft

7 Gate

stops

3

×

10 AWG up to 340 ft

8 Switch

9

Wiring to main circuit breaker

I

NSTALLING

THE

455 D C

ONTROL

P

ANEL


Locate the control panel in the most convenient position

possible, considering the movement of the gate. Figure

7 shows a basic layout for a two-leaf gate with the 400

Operator.

Installing the control panel consists of the following

general steps:

Connecting the main power to the control
panel

Connecting the activating device

Connecting the operator to the control panel

Checking the direction of the motor's rotation

Connecting other devices to the control panel

Set operating modes


The installer is responsible for grounding the gate and

operator systems, for providing the main power breaker

switch, and for making sure that the entire gate system

meets all applicable electrical codes.

For the complete 455 D Control Panel Installation

Instructions, see pages 14—25 of this manual.

This manual is related to the following products: