2. Reassembly Instructions For Dryers Shipped In Three (3) Pieces

When the dryer is shipped in three (3) pieces, the tumbler (basket) and the tumbler (basket) base sections are

shipped as two (2) separate pieces. The heat console section is shipped as the third piece.

a. Reassemble The Tumbler (Basket) Base Section To The Heat Console Section

Move the heat console section into position by using cables through the eye bolts located at the top of the

section or by using a fork truck and lifting the section from underneath. The tumbler (basket) base section

is now moved into position with a fork (lift) truck. The seven (7) clearance holes located on the right side

of the tumbler (basket) base section (four [4] holes in front and three [3] at the back of the section) must

be aligned with the seven (7) 3/8-16 tapped holes on the left side of the heat console section. Use the

3/8-16 x 3” long bolts and the tapered shims supplied with the unit to bolt the section together.

b. Reassemble The Tumbler (Basket) Section Over The Tumbler (Basket) Base

Slowly lower the tumbler (basket) section over the tumbler (basket) base. The four (4) large slots located

on the bottom of the tumbler (basket) section (one slot at each corner of the tumbler [basket] section)

must be aligned with the top of the pistons in the tumbler (basket) base section. Use the four (4) 1-1/4-12

x 3-1/2” long bolts supplied with the unit to secure the tumbler (basket) section to the tumbler (basket)

base section.

c. Reattach The Control Pendant Arm

Position the control pendant arm to the top front of the heat console section by aligning the clearance

holes in the arm with the 1/4-20 tapped holes on the top of the heat console section. Use the 1/4-20 x 3”

long bolts supplied with the machine to attach the arm to the console.

d. Reconnect The Internal Air, Electric Connections, and Water Connections (refer to page 12 through

page 17).

3. Reassembly Instructions for Dryer Shipped in Four Pieces

In this method of shipment the tumbler (basket) section, tumbler (basket) base, lower heat console, and

upper heat console are ALL shipped as separate sections.

a. Reassemble The Heat Console Section

Apply silicone (provided with unit) to the flanges of the lower heat console section. Lift the upper heat

console section by use of cables through the eyebolts located on the top of the upper console section.

Position the upper heat console over the lower heat console section. Use the 5/16-18 hardware provided

with the machine to secure the sections together.

b. Reassemble The Tumbler (Basket) Base Section To The Heat Console Section

Move the heat console section into position by using cables through the eyebolts located at the top of the

section or by using a fork (lift) truck and lifting the section from underneath. The tumbler (basket) base

section is now moved into position with a fork (lift) truck. The seven (7) clearance holes located on the

right side of the tumbler (basket) base section (four [4] holes in the front and the three [3] at the back of

the section) must be aligned with the seven 3/8-16 tapped holes on the left side of the heat console

section. Use the 3/8-16 x 2” long bolts and the tapered shims supplied with the unit to bolt the sections

together.