beautypg.com

Installation and operation, Ul requirements – Extron Electronics SCP 104 Series User Guide User Manual

Page 11

background image

Installation and

Operation

This section describes the front and rear panel features of the
six SCP 104/226 models and provides procedures for installing
and operating the control panels. Topics that are covered
include:

UL Requirements

Installation Overview

Installing or Replacing Button Labels

Rear Panel Features and Connections

SCP and System 5 IP Button Functions

Mounting the SCP

Front Panel Features

Resetting

Updating the Firmware

UL Requirements

The Underwriters Laboratories (UL) requirements listed
below pertain to the safe installation and operation of the
SCP 104/226 into a wall or furniture.

Do not use the SCP near water or expose it to liquids.

WARNING:

Risk of fire or electric shock. Do not expose

this apparatus to rain or moisture.

Clean the SCP only with a dry cloth.

Do not install the SCP near any heat source, such as a
radiator, heat register, stove, or other apparatus that
produces heat (including amplifiers).

Unplug the SCP during lightning and thunderstorms or when
it will be unused for long periods.

For the installation to meet UL requirements and to comply
with National Electrical Code (NEC), the SCP must be
installed in a UL approved junction box. The end user or
installer must furnish the junction box; it is not provided by
Extron.

SCP 104 and SCP 226 • Installation and Operation

5

This manual is related to the following products: