Testing the installation, Completing the installation – Extron Electronics MLM-WB+ User Manual
Page 24
MLM-WB+ • Installation
18
•
Using mounting screws to secure each piece of equipment with rack mounting
ears to the holes in the enclosure
SYST
EM 5 IP
PC
VID
EO
INP
UT
5
CL
IP
NO
RM
AL
VO
LU
ME
AU
DIO
AD
JU
ST
SIG
NA
L
DIS
PL
AY
RO
OM
CO
NT
RO
L
INP
UT
SE
LE
CT
ION
SWSTEM
SWITCHER
CO
NFIG
IR
ME
NU
NEX
T
2
3
4
5/ R
GB
1
LAP
TOP
DVD
VCR
DESKT
OP
PC 1
RO
OM
REL
AY
3
RO
OM
REL
AY
2
RO
OM
REL
AY
1
OFF
ON
PR
OJ
EC
TOR
1
2
3
4
5
6
VO
LU
ME
CO
NFI
G
IR
PC
AUX
VID
EO
DV
D
VCR
LAP
TOP
AU
TO
IMA
GE
MUT
E
ON
OFF
Ext
ron
ML
C 2
26 I
P L
Figure 16.
Securing Equipment with Rack Mounting Brackets (Rack
Ears)
NOTE: Do not tighten the clamps or screws completely until you have tested
the installation and made any needed adjustments to the cabling or switch
settings.
7.
Replace the top of the enclosure and use the four screws you removed in
step 1 to reattach it.
Testing the Installation
Test the installation as follows:
1.
Supply power to all input and output devices, the host computer, and so on.
2.
Test all equipment, connections, and devices. Make adjustments to wiring, switch
settings, and so on, as needed.
Completing the Installation
After you have pretested the installation and made any necessary adjustments, you can
secure all equipment in the MLM-WB+.
1.
Secure the equipment in the 4U rack enclosure by completely tightening the clamps
or rack mounting screws.
2.
Using cable ties, secure all power and AV cables to the cable guide behind the 4U
rack enclosure (cut off any excess cable tie that protrudes). This provides strain
relief as you open and close the door.