Openings for input and output cable connections, See fig. 3.4.1-5, Modifications reserved page 13/37 – GE Industrial Solutions SG Series 100 – 120 – 150 kVA Installation Guide User Manual
Page 13

Openings for input and output cable connections
SG
T5
00
0_
10
0-1
50
_U
PS
vie
w t
op
_0
1U
S
47.25"
1,200mm
1
40
4.93"
125mm
.58"
mm
800
mm
31.
50"
18.
90"
480
mm
2.7
6"
70m
m
Utility input
Output Load
Battery
Fig. 3.4.1-2 Opening on top of the cabinet for input and output cables
SG Series openings are
provided on the top and
the bottom of the UPS
for the connection of
input and output cables.
Pay attention to the
position of these
openings, when
choosing the placement
of the UPS.
These openings are
covered with a
protective plate.
SG
T5
00
0_1
00
-15
0_U
PS
vie
w b
otto
m_
01
US
47.25"
1,200mm
7.2
9"
185
mm
115mm
4.53"
50mm
1.97"
Utility input
Output Load
14.
37"
365
mm
31.
50"
800
mm
Fig. 3.4.1-3 Opening on the bottom of the cabinet for input and output cables
Positioning of the UPS cabinet
SG Series is equipped with wheels for easy
placement of the UPS.
To make the UPS movable on wheels, the
bolts on each leg of the cabinet have to be
turned counter-clockwise, until they are
free from the floor and thus the cabinet
supported on wheels.
After having positioned the UPS at its final
location, the cabinet has to be secured by
rotating the bolts on each leg clockwise,
but the wheels must still touch the floor.
To lower
To lift
S
G
T
5
0
0
0
_
1
0
0
-15
0_
U
PS w
hee
ls
_G
E
_01U
S
Fig. 3.4.1-4 Bolts for the regulation of the cabinet
The UPS cabinet is free standing
and normally does not require to
be bolted to the floor.
The UPS cabinet can be fixed
however to the floor by bolting it
with the supporting blocks to the
floor.
The supporting blocks can be
used in different positions (0° -
360°)
These supporting blocks are part
of the shipping package.
SG
T
5000_100
-150_U
PS fi
x
in
g_01
0 - 360°
See Fig. 3.4.1-5.
Fig. 3.4.1-5 Fixing of the UPS cabinet on the floor
Modifications reserved
Page 13/37
OPM_SGS_ISG_M10_M15_0US_V040.doc
Installation Guide SG Series 100 –120 – 150 kVA